v0.1
User guides

System Administrator Guide

This guide is for users with the Admin role. System Administrators have the highest level of access in AI Insight. They manage Backoffice and automatically inherit all Team Manager and Project Administrator capabilities.

What you can do

Portal areaRouteWhat you can do
Dashboard#/dashboardReview your own monthly usage and cost summary.
Backoffice overview#/backofficeReview administrative summaries and platform status.
Usage uploads#/backoffice/uploadsUpload provider usage CSV files and review import results.
Users & roles#/backoffice/rolesRefresh the authorised-user snapshot and assign application roles.
Financial settings#/backoffice/financial-settingsConfigure global model cost and included-credit settings.
Ecological settings#/backoffice/ecological-impactSave provider processing regions, inspect configuration/run history, and confirm bounded recalculation or retry.
Custom providers#/backoffice/custom-providersManage custom AI provider definitions and upload their usage data.
Teams workspace#/teamsManage team hierarchy with inherited Team Manager authority.
Projects workspace#/projectsManage all projects with inherited Project Administrator authority.
Screenshot required

Backoffice overview screen (#/backoffice) — show the administrative summary panel, platform status indicators, and sub-navigation links to Uploads, Roles, Financial Settings, and Custom Providers.

Uploading usage data

Usage uploads are the primary data feed for all dashboards and financial views. Upload a new file each time you receive a fresh usage export from a provider.

1
Open #/backoffice/uploads.
2
Select the usage CSV file for the relevant provider and reporting period.
3
Upload the file and wait for processing to complete.
4
Review the import summary: imported rows, rejected rows, warnings, and duplicate detections.
5
Navigate to Dashboard or a financial view to verify data appears as expected.
Screenshot required

Usage upload screen — show the file picker area and a post-import result summary with imported/rejected/warned row counts and a duplicate detection notice.

Common upload failures: invalid CSV headers, duplicate file hash, upload size limits, or storage configuration issues. Check the error detail in the import summary.

Accepted imports also record ecological evidence and a separate finalization status. Pending, unavailable, or failed ecological calculation does not erase accepted credits. Inspect source model/output tokens, provider settings, and safe run outcomes before re-importing or retrying history.

Refreshing the authorised-user hierarchy

1
Open #/backoffice/roles.
2
Upload the hierarchy roster CSV.
3
Review the import results: applied, anonymised, and restored user counts.
4
Confirm users display with the expected authorised or anonymised status.
The hierarchy import replaces the active snapshot atomically. Historical usage records are preserved.
Screenshot required

Authorised-user hierarchy import screen — show the CSV upload area and a post-import summary table with Applied, Anonymised, and Restored columns.

Assigning application roles

1
Open #/backoffice/roles.
2
Search for the user you want to update.
3
Assign one of the supported roles: User, Admin, TeamManager, or ProjectAdministrator.
4
Ask the user to refresh their portal so the navigation bar updates.
RoleWhat it grants
UserDefault role — Dashboard access only.
TeamManagerTeams workspace for owned hierarchy branches.
ProjectAdministratorProjects workspace for all active projects.
AdminFull Backoffice access plus inherited TeamManager and ProjectAdministrator capabilities.
Do not assign both Admin and TeamManager (or ProjectAdministrator) to the same account. The Admin role inherits those capabilities automatically.
Screenshot required

Users and roles screen — show the user search field, a selected user with their current role badge, and the role assignment dropdown with the four available roles.

Configuring financial settings

1
Open #/backoffice/financial-settings.
2
Update model cost settings (cost per credit or per token) for each provider and model.
3
Update included-credit assumptions per provider.
4
Save changes.
5
Validate dashboard and project financial views for the expected month and provider.
Screenshot required

Financial settings screen — show the model cost table with editable cost-per-credit fields and the included monthly credits section per provider.

These settings affect all financial calculations across the portal immediately on save. Review carefully before confirming.

Configuring ecological settings

Only Admin can change shared ecological geography or inspect administrator audit/run history. Authorised personal/team/project viewers can read their applied estimation basis without receiving these administrative rights.

1
Open #/backoffice/ecological-impact, or use Ecological settings from an authorised report panel. Review Provider settings and runtime/catalog status.
2
Select a supported Processing region. Review factor-specific warnings, including world-average water factors where applicable. The region is an estimation assumption, not a location inferred from users.
3
Select Save. Historical estimates are not recalculated; they retain their original geography with a previous-configuration label.
4
For a concurrent-save conflict, review the latest revision and use Reload confirmed setting before saving again. Errors preserve unsaved edits; Cancel discards the local provider edit.
5
Return to dashboard restores the originating personal/team/project context when settings were opened from a panel. Unsaved changes require confirmation before leaving.

Do not infer output tokens from credits or transactions, substitute unsupported models, or treat unknown data as zero. Each metric has independent coverage; 100% of known tokens can coexist with unknown contributions. See the coverage and assumptions guide.

Recalculating retained history

1
Save or cancel unsaved region edits, then select Recalculate for the provider. Only one recalculation can be active for that provider.
2
Review the saved region/revision in Recalculate ecological impact. Enter From (inclusive) and To (inclusive) within retained history: at most 366 inclusive days and no future UTC date.
3
Select Confirm recalculation. Only that provider/date range is replaced. Other providers/dates stay unchanged, and later settings saves do not change the queued run's captured region.
4
Review processed days and unavailable contributions. Expand Day outcomes and use Next days where available. Completed with warnings is different from a failed operation.
5
Open Configuration and calculation history, choose Load history, and select a historical run to inspect original dates, region, basis, and safe outcomes.
6
Use Retry this range for failed/superseded history. Reconfirm the prefilled dates against the current saved region/revision. A deliberate retry is a new operation; repeating an unacknowledged confirmation does not duplicate its request.

If progress loading fails, polling pauses until Retry progress. This reads status rather than queuing another calculation. Polling stops on terminal runs, removed providers, permission loss, or leaving the page; unsaved configuration remains protected.

Pending/failed replacements keep prior values explicitly outdated and outside current subtotals, without changing financial usage. Reprocessing cannot invent missing source tokens or repair unsupported models. For removed regions/providers or degraded runtime/catalog status, follow the safe message and contact a deployment operator. Never share raw tracebacks, prompts, credentials, or private exports in support diagnostics.

Managing custom providers

1
Open #/backoffice/custom-providers.
2
Create a new provider or select an existing one to update.
3
Configure the provider name and logo.
4
Upload provider-specific usage data using the same process as built-in providers.
5
Review the import summary for warnings or rejected rows.
Screenshot required

Custom providers screen — show the list of existing custom providers, the Add provider button, and an open provider detail panel with name, logo upload, and usage import fields.

Notification and support settings

SettingPurpose
SUPPORTCONTACT__ADMINISTRATOREMAILAdministrator support email shown in the portal Help experience.
AzureEmail__ConnectionStringAzure Communication Services Email connection string for threshold notifications.
AzureEmail__FromAddressVerified sender address for notification emails.
AzureEmail__FromNameSender display name shown to recipients.
Notifications__ThresholdEvaluation__CronScheduleCron schedule for the safety-net threshold evaluation job.
TZContainer time zone used when interpreting the notification schedule.
To verify notification readiness safely, check notifications.emailDeliveryConfigured and notifications.senderConfigured from GET /api/app/context. Avoid dumping raw environment variables from live containers.

Frequently asked questions

Why might an upload fail even with the correct file?
Common causes: CSRF/antiforgery state (refresh and retry), invalid CSV headers, duplicate file hash, upload size limits, or storage configuration issues. Check the error detail in the import summary.
Can I assign a role to a user who has never signed in?
The user must be resolvable in the application's identity data. If missing, refresh the authorised-user hierarchy with a roster CSV that includes their identity.
A user was assigned a new role but cannot see the new link — what do I do?
Ask the user to refresh the portal. If the link is still missing, verify the role assignment in #/backoffice/roles and check the capability flags in GET /api/app/context.
What happens when notification email is not configured?
Threshold evaluation continues on schedule. The system records a skipped notification entry rather than sending a malformed email. Configure Azure Communication Services Email settings to begin sending messages.